JSW Steel inaugurates CRM2 facility in Karnataka
JSW Steel has launched its Cold Roll Mill 2 (CRM-2) facility at Vijayanagar works, Karnataka.
The new CRM-2 complex, with a production capacity of 2.3 million tonnes per annum (MTPA), is the most sophisticated plant by configuration with capability to produce high strength and advanced high strength steel, both in uncoated and coated categories and wider width up to 1,870 mm. The CRM-2 facility includes a continuous annealing line, which is the first to start operations in India.
JFE Steel, which has a 15 per cent stake in JSW Steel, has been providing technical assistance to develop various grades of auto steel, including steel for external panels for automobiles, to meet the high demand from both domestic and international arena.
Dr Vinod Nowal, Deputy Managing Director, JSW Steel said, “The CRM-2 is equipped with the latest technology to produce continuously annealed CR up to a strength level of 980 MPA (UTS) and auto galvanising line with capability to produce both GI and GA up to a strength level of 590 MPA (UTS). At present, the high strength and higher grades are mostly imported.”
The phase-2 of the CRM-2 plant consisting of 0.95 MTPA CAL-2 is targeted to be commissioned during first half of FY16. The new plant will be the cornerstone of JSW Steel’s growth story enhancing the share of value added products in the product basket of company.
43
Cookie Consent
We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.