With record-breaking footfall, LED Expo Mumbai showcased cutting-edge lighting innovations, empowering industries with smart, sustainable, and design-forward lighting technologies.
Freight Wings Pvt. Ltd. successfully installed a 2500 Tonnes Arch Bridge with dimensions of 143.3 x 31.8 x 31.27 as part of the Mumbai Coastal Road Package 2 project, demonstrating their engineering prowess.